Indian Railway

Indian Railways generated 14,14,604 mandays during the Garib Kalyan Rozgar Abhiyan

Garib Kalyan Rozgar Abhiyan was announced on 20.06.2020 for 125 days i.e., up to 22.10.2020. The Indian Railways identified 143 numbers of ongoing infrastructure projects like doubling of the railway line, electrification of the line, construction of the new line, construction of Bridge/Road over Bridge, Signaling works, etc. for expediting the progress of these projects, under Garib Kalyan Rozgar Abhiyan in six selected States. Details are as under:

S.No.StateNo. of Infrastructure Projects
1Bihar36
2Jharkhand4
3Madhya Pradesh28
4Odisha6
5Rajasthan16
6Uttar Pradesh53
 Total143

Indian Railways generated 14,14,604 mandays during the Garib Kalyan Rozgar Abhiyan in the above States. Details are as under:

S.No.StateNo. of mandays generated
1Bihar3,95,527
2Jharkhand20,572
3Madhya Pradesh2,05,415
4Odisha84,190
5Rajasthan1,96,521
6Uttar Pradesh5,12,379
 Total14,14,604

This information was given by the Minister of Railways, Communications and Electronics & Information Technology, Shri Ashwini Vaishnaw in a written reply to a question in Lok Sabha today.

Back to top button